研究带基数约束的两台机流水车间作业分批排序问题,针对极小化最大完工时间的目标函数,首先提出了一个整数线性规划模型,然后基于两台机流水车间作业的Johnson算法思想,即将工件集分成第一台机器上加工时间更少和第二台机器上加工时间更少两个集合,设计了一个启发式算法,并且利用随机生成算例进行了数值实验。计算结果表明,无论是小规模数据集还是大规模数据集,所提出的启发式算法相比商业优化求解软件Gurobi,在计算结果和求解时间方面均具有优势。
This paper discusses the problem of scheduling batches on two machines in flow shop with cardinality constraints. The objective is to minimize the makespan. We first present an integer linear programming model. Based on the Johnson algorithm, the job set is divided into two sets, with less processing time on the first machine and with less processing time on the second machine, respectively, and a heuristic algorithm is then designed. Numerical experiments are conducted by using randomly generated examples. The calculation results show that the proposed algorithm has advantages in both computational results and solution time compared with the commercial optimization solution software Gurobi, on both a small-scale dataset and a large-scale dataset.
[1]JOHNSON S M. Optimal two-and three-stage production schedules with setup times included[J]. Naval Research Logistics Quarterly, 1954, 1(1): 61-68.
[2]POTTS C N, STRUSEVICH V A, TAUTENHAHN T. Scheduling batches with simultaneous job processing for two-machine shop problems[J]. Journal of Scheduling, 2001, 4(1): 25-51.
[3]GRAHAM R L. Bounds for certain multiprocessing anomalies[J]. Bell System Technical Journal, 1966, 45(9): 1563-1581.
[4]DAMODARAN P, SRIHARI K. Mixed integer formulation to minimize makespan in a flow shop with batch processing machines[J]. Mathematical and Computer Modelling, 2004, 40(13): 1465-1472.
[5]LIAO C J, LIAO L M. Improved MILP models for two-machine flowshop with batch processing machines[J]. Mathematical and Computer Modelling, 2008, 48(7/8): 1254-1264.
[6]MANJESHWAR P K, DAMODARAN P, SRIHARI K. Minimizing makespan in a flow shop with two batch-processing machines using simulated annealing[J]. Robotics and Computer-Integrated Manufacturing, 2009, 25(3): 667-679.
[7]CHEN H, ZHOU S, LI X, et al. A hybrid differential evolution algorithm for a two-stage flow shop on batch processing machines with arbitrary release times and blocking[J]. International Journal of Production Research, 2014, 52(19): 5714-5734.