Young Editorial Board Members' Column

Research on maintenance strategy of auxiliary inverter based on improved DDQN

  • GONG Qi ,
  • JIANG Haoxin ,
  • LIU Dake ,
  • ZHI Pengpeng
Expand
  • 1. Zhan Tianyou College (CRRC College), Dalian Jiaotong University, Dalian Liaoning 116028, China;
    2. Shenyang EMU Depot, China Railway Shenyang Group Co., Ltd., Shenyang Group Co., Ltd., Shenyang Liaoning 110000, China;
    3. Yangtze Delta Region Institute (Huzhou), University of Electronic Science and Technology of China, Huzhou Zhejiang 313001, China

Received date: 2026-03-02

  Online published: 2026-06-10

Abstract

With the continuous expansion of rail transit networks, the reliability of auxiliary inverters exerts a direct impact on train safety and maintenance costs. To balance reliability and maintenance costs, an optimized maintenance strategy based on the improved Double Deep Q-Network (DDQN) is proposed. First, a fault distribution model is established considering four operating conditions, and its parameters and reliability functions are fitted using the Least Squares-Genetic Algorithm (LS-GA).Second, a reliability-centered maintenance decision model is developed, which incorporates imperfect maintenance and maintenance costs, and adopts four maintenance actions: “No Maintenance, Routine Repair, Advanced Repair, and Replacement”. Then, a Long Short-Term Memory-attention (LSTM-attention) mechanism, cosine decay exploration, and prioritized experience replay are introduced into DDQN to enhance model stability and convergence. Finally, a fuzzy controller is added to dynamically adjust the reward function and optimize the maintenance strategy, and comparative validation is performed. The results indicate that the improved DDQN algorithm, considering the four operating conditions, significantly reduces maintenance costs and provides a reference for the intelligent maintenance of rail vehicles.

Cite this article

GONG Qi , JIANG Haoxin , LIU Dake , ZHI Pengpeng . Research on maintenance strategy of auxiliary inverter based on improved DDQN[J]. Journal of Hangzhou Dianzi University, 2026 , 46(3) : 1 -12 . DOI: 10.13954/j.cnki.hdu.2026.03.001

References

[1]计皓.航空电源系统预防性维修策略优化[J].航空维修与工程,2025(5):68-70.
[2]于俭,汪竹杏,李晓,等.二维非更新产品延长保证策略研究[J].杭州电子科技大学学报(自然科学版),2016,36(2):97-102.
[3]王红,祁连山,何勇.基于Wiener过程的高速列车车轮两阶段视情维修策略研究[J].铁道科学与工程学报,2025,22(8):3377-3386.
[4]李昱霖,贺德强,孙海猛,等.基于DDQN的列车转向架部件维护和备件库存联合优化研究[J].铁道科学与工程学报,2025,22(9):3920-3930.
[5]吴其隆,冯强,任羿,等.基于深度强化学习的无人机集群预测性维修决策算法[J].兵器装备工程学报,2024,45(11):283-290.
[6]FERREIRA NETO W A, VIRGÍNIO CAVALCANTE C A, DO P. Deep reinforcement learning for maintenance optimization of a scrap-based steel production line[J]. Reliability Engineering & System Safety, 2024,249:110199.
[7]DUI H Y, XU H T, ZHANG L Y, et al. Cost-based preventive maintenance of industrial robot system[J]. Reliability Engineering & System Safety,2023,240:109595.
[8]CHEN M, KANG Y, LI K, et al. Deep reinforcement learning for maintenance optimization of multi-component production systems considering quality and production plan[J]. Quality Engineering,2025,37(2):219-230.
[9]ZHANG H X, WEI X K, LIU Z Q, et al. Condition-based maintenance for multi-state systems with prognostic and deep reinforcement learning[J]. Reliability Engineering & System Safety,2025,255:110659.
[10]周一帆,郭凯,李帮诚.基于多智能体强化学习的多部件系统维修优化[J].长沙理工大学学报(自然科学版),2023,20(2):27-34.
[11]WEI Z Q, ZHAO Z B, ZHOU Z, et al. A deep reinforcement learning-driven multi-objective optimization and its applications on aero-engine maintenance strategy[J]. Journal of Manufacturing Systems,2024,74:316-328.
[12]SUN C L, LI H T. Construction of universal approximators for multi-input single-output hierarchical fuzzy systems[J]. IEEE Transactions on Fuzzy Systems,2023,31(12):4170-4179.
[13]SWAIN S C, MAHALA B K, SAHU P C, et al. Design and assessment of fuzzy controllers for LFC of multisource electrical system: A novel Sinh-Cosh (ShCh) technique[J]. Results in Engineering,2025,27:106968.
Outlines

/

〈 〉